Portal crane mobile Device reloading mobile
Producer: Russia
- -
-
Article Type |
|
|
UPM 1,0 - 3,0 |
UPM 1,0 - 4,0 |
UPM 1,0 - 5,0 |
UPM 1,0 - 6,0 |
Loading capacity with the jib boom length |
|
kg |
1000 |
1000 |
1000 |
1000 |
Flight width
|
In |
m |
3000 |
4000 |
5000 |
6000 |
Rise height
|
- |
m |
3000 |
3000 |
3000 |
3000 |
Max. horizon movement
|
- |
mm |
2380 |
3380 |
4380 |
5380 |
Crane length
|
B1 |
mm |
3180 |
4180 |
5180 |
6180 |
Number of the profile of the beam two - Tauri
|
- |
- |
No. 20 |
No. 20 |
No. 24 |
No. 240 |
Mass of the crane |
- |
kg |
300 |
320 |
375 |
405 |
Wheels are full - rotary |
With the brake - 2, without brake - 2 |
1. Portal crane Device reloading mobile
1.1 The device consists of the beam flying on which it is hung tal, beams basic, racks, struts 4, wheels rotary with the brake - 2 which fasten among themselves standard fasteners.
1.2 The flying beam represents the dvutavrovy beam with welded flanges for fastening it to racks. Basic beams and racks are executed from the profile of square section or welded from channels with the welded flanges.
1.3 Working body of the device are the carriage and tal it is ordered in addition,
2. Preparation for work
2.1 Unpack and reactivate device components.
2.2 Expose on the floor the flying beam with racks, having enclosed identical wooden linings 50 - 80 mm high for protection of the paint and varnish covering and connect them by means of bolts, nuts, having enclosed washers.
2.3 Install the carriage and tal on the flying beam.
2.4 Expose on the earth on supports height of more wheel support in the steady position basic beams on width of flight of the device.
2.5 Lift the flying beam with racks by means of the heavy lift gear and connect to basic beams by means of bolts and nuts, having enclosed washers.
2.6 Expose struts and connect them to basic beams and racks by means of bolts and nuts, having enclosed washers
2.7 After final assembly check work of the waist and the device in general empty: make movement of the device without load and check of operation of the mechanism of lifting and moving the waist without loading. Movement of the device and the waist shall be smooth without breakthroughs and jammings.
2.8 Before operation test the device: raise the waist the load of 1,25 t on height of 100 - 200 mm, sustain for 10 min. in extreme points at the traveling emphasis and in the middle of the flying beam, lower the load. After removal of loading residual deformations of the metal construction of the device shall not be observed. Having convinced that all in operability, it is possible to start operation of the device.
3. Indication of security measures
3.1 Operation of the device, its engineering certification and supervision of technical condition shall be exercised according to Rules for the Construction and Safe Operation of hoisting cranes.
3.2 In each shift the worker responsible for operation of the device, after its check shall be appointed to knowledge of Rules for the Construction and Safe Operation of hoisting cranes and instructions of the crane operator and slinger.
3.3 The workers conducting installation works shall pass the personnel safety notification and on work with the device.
3.4 Load lifting, having weight close to nominal loading capacity, shall be made in two steps: at first to lift the load on height about 200 mm, to be convinced of correctness and reliability of the strapping of the load, then to make the pull on complete height
-
It is possible to learn about goods in more detail on
Ph. :
|